1
ASSESS
We look at the grade, what the wall has to hold, how water moves across the site, and whether a permit applies at that height.
2
PROPOSAL
Wall type, height, length, materials, drainage detail, and a written itemized price.
3
EXCAVATE & BASE
We over-excavate behind the wall line and compact a leveling pad. The base course sets the accuracy of every course above it.
4
BUILD & BACKFILL
Units go up with the correct batter, drainage stone and fabric go in behind as we climb, and backfill is compacted in lifts.
5
CAP & RESTORE
Caps are set and secured, the terrace above is graded and planted, and the surrounding lawn is restored.